How it comes up
How Unapproved Renovations and Structures Come to Light in a Sale
It’s rarely council that finds it first. In a sale, it usually surfaces through one of these.
Legal Searches
The buyer’s conveyancer compares the house with the approved plans on council’s property file.
Listing Photos
Photos show a “fourth bedroom” that council’s records say is a garage.
Site Inspection
The buyer’s inspector mentions a structure that looks newer than the rest of the house.
Bank Valuation
The valuer questions rooms or structures that don’t match the approvals.
Neighbour Report
A neighbour mentions it to the buyer, or has already complained to council.
The 10.7 certificate won’t flag it. The section 10.7 planning certificate attached to every NSW contract covers the land’s planning controls. It won’t show a deck someone built without approval.
Start here
First Question: Did It Need Approval at All?
Not everything without paperwork is unapproved. Some minor work is exempt development and never needed approval, as long as it meets every standard in the State’s Exempt and Complying Development Codes. Size, height, setbacks and the type of land all count, so it’s worth checking before anyone panics.
The standards cover more than size. How far the structure sits from the boundary, how high it is off the ground and whether the land is affected by things like heritage listing, bushfire or flooding can all change what’s allowed. A deck that would be exempt on one block may need approval on the next.
If you’re not sure, a certifier can compare what was built against the exempt development standards and tell you whether approval was needed in the first place. That answer decides everything else in this guide.
Can be exempt, if every standard is met
- ✓ Some small decks
- ✓ Pergolas
- ✓ Garden sheds
- ✓ Carports
- ✓ Fences
Needs approval
- ✕ Granny flats
- ✕ Extensions
- ✕ Turning a garage into a room people live in
- ✕ Enclosing a verandah as a room
For sellers
Selling a House with Unapproved Structures
If you’re selling a house with unapproved structures, you have three realistic options. Which one makes sense depends on how much time you have before listing and how serious the work is.
Option 1 · Least risk for buyers
Get a BIC before you list
Best if you have a few months before the campaign. A registered certifier reports on the work, any fixes are done, and you apply to council for a building information certificate (BIC).
Council can ask for plans, a survey or certificates before it decides, so allow time. Once it’s issued, buyers’ conveyancers can see the work is covered.
Option 2 · If time is short
Get it assessed and share the report
Suits sellers listing within weeks. A BCA report prepared before listing sets out what was built, what complies and what needs fixing.
It turns an open-ended risk into a known list buyers can price, and it’s also the first step if you decide to apply for a BIC later.
Option 3 · Expect a discount
Sell as is
The quickest option, but expect a discount. Some buyers will ask for a lower price, a BIC before settlement or a longer settlement, and some will walk away.
A lender’s valuer may also leave the unapproved area out of the value, which can affect the buyer’s finance. Ask your conveyancer or solicitor how the work is described in the contract.
Ceiling height is one of the first checks in a garage conversion.
What a building information certificate does
| Issued by | Council only. A certifier’s report supports the application. |
| Protects against | Orders to demolish, alter or rebuild work that existed when it was issued. |
| Doesn’t do | Approve the work, or stop fines against whoever built it. |
| Who can apply | The owner, or a buyer once contracts are exchanged. |
| No decision? | After 40 days it counts as refused, and you can appeal. |
| Fees | Usually higher for unauthorised work. |
A BIC isn’t automatic. Council considers whether the work would have been approved if someone had applied. If it never would have been, council may refuse the BIC and order changes instead. That’s why it pays to have the work assessed before you apply.
Be careful how the listing describes it
Agents can’t mislead buyers. Calling an unapproved garage conversion “bedroom 4” can create problems later. Talk to your agent and conveyancer about how unapproved rooms and structures are described.
Selling with a pool
The contract must include a pool certificate of compliance, a relevant occupation certificate, or a certificate of non-compliance. With a non-compliance certificate, the buyer has 90 days after settlement to fix the barrier. Leave it out and the buyer may be able to cancel. Pool compliance certificates
Contact Our Friendly & Experienced Team
Get a BCA Report for Unapproved Structures Before You Sell
✓ Trusted certification & compliance ✓ Experienced private certifiers ✓ Servicing Greater Sydney
✓ Trusted certification & compliance
✓ Experienced private certifiers
✓ Servicing Greater Sydney
For buyers
Buying a House with Unapproved Renovations
Buying a house with unapproved renovations is often less risky than it sounds. Plenty of it is a deck or a carport that needs a few items fixed. The risk is not knowing which kind you’re looking at.
The work itself is only part of the risk. Once you settle, any council order about the work can be given to you as the new owner, and the cost of fixing it becomes yours. That’s why the checks below matter most before you exchange, while you can still negotiate or walk away.
Cooling-off in NSW
| How long | 5 business days after exchange, for private treaty sales. |
| Cost to withdraw | 0.25% of the purchase price. |
| Auctions | No cooling-off at auction, or for contracts exchanged on auction day. |
| Waivers | It can be waived with a section 66W certificate. |
Five days is short to get a report back, so do your checks before you exchange wherever you can.
Check before you exchange
Ask the agent directly whether every structure and conversion has approval.
Have your conveyancer get the approved plans and certificates from council and compare them with what’s on site.
Ask your conveyancer to order council’s certificates on outstanding notices and orders (sections 735A and 121ZP).
Look hard at converted garages, enclosed verandahs, rooms under the house and anything at the back of the block.
If something looks unapproved, get it assessed before you commit.
A standard pre-purchase building inspection looks for defects. It doesn’t usually confirm whether work was approved.
Things you can negotiate
Your conveyancer or solicitor will tell you what’s possible in your contract. Buyers in this position commonly ask for:
BIC before settlement
The vendor obtains a building information certificate before the sale completes.
Lower price
A reduction that covers the cost of dealing with the work.
Longer settlement
More time so the vendor can deal with the work first.
The vendor’s reports
Copies of any BCA report or engineering the vendor already has.
Once you own it, tell your insurer
Let your home insurer know about any unapproved structures. Not disclosing them can lead to a claim being refused.
Dealing with it after settlement
You can apply for a BIC as the owner after settlement, or as the buyer once contracts are exchanged. Find out what’s involved first, because council may require changes.
Look closer
Granny Flats and Garage Conversions Need the Closest Look
These cause the most trouble in sales because they’re used as rooms people live in, so the building rules are stricter than for a deck or shed. Here’s what usually gets checked.
Usually a small fix
Decks
Decks more than 1 metre off the ground need a balustrade. A certifier checks its height and the gaps between balusters, along with stairs, footings, framing and how the deck is fixed to the house. Many unapproved decks come down to one or two fixes, such as raising the balustrade.
Several questions at once
Garage bedrooms
A garage is built as a non-habitable structure, so using it as a bedroom means meeting the rules for a room people live in. A certifier checks ceiling height, light and ventilation, smoke alarms, waterproofing and fire separation near boundaries. Several of these often need work at once.
Check before you price it in
Granny flats
A granny flat needs approval, and an unapproved one is assessed much like a house. A certifier checks structure, fire separation, waterproofing, smoke alarms, and plumbing and electrical sign-offs. If the sale includes rental income from it, confirm it was approved before you price that income in.
Costs
What It Costs to Fix
No two jobs are the same, so any quote follows an inspection. These four things make the biggest difference.
Type of Work
Smaller items, like a missing smoke alarm or waterproofing certificate, add little to the cost. Structural or fire separation problems take more investigation and usually more rectification work.
Number of Structures
Each deck, room or outbuilding is assessed on its own. The more structures involved, the longer the inspection and report take, and the more items there may be to fix.
Existing Paperwork
Plans, approvals and trade certificates you already have can save time. Where they’re missing, they may need to be recreated, such as new drawings or a survey of what was built.
Engineering Input
Structural work like footings, beams or retaining walls usually needs an engineer’s assessment. That sign-off sits on top of the certifier’s report and adds to the overall cost.
Council fees for a BIC covering unauthorised work are usually higher than for a standard BIC. The work needed to bring things into line often costs more than the report, and that’s what buyers should find out before they commit.
Getting Unapproved Work Assessed with a BCA Report
CertOne prepares BCA reports on unapproved renovations and structures across Greater Sydney, for vendors before listing and for buyers before they commit.
A BCA report assesses the existing work against the National Construction Code, including the Building Code of Australia, and identifies whether it appears capable of achieving compliance. Where there are issues, it sets out what may need further investigation, rectification or extra documentation. The same report can support a building information certificate application if you decide to go down that path.
Every report is prepared by a registered certifier.
Step 1: Initial review
Send us any council letter, plans, photos and details of the work. We confirm what’s involved and send you a free fee proposal.
Step 2: Site assessment
A certifier inspects the completed work against the National Construction Code, checking items like balustrades, ceiling heights, waterproofing and smoke alarms.
Step 3: BCA report
You get a written report showing what complies, what needs fixing and anything that needs further investigation, such as an engineer’s assessment.
Step 4: Next steps
We explain the findings and your options, from rectification to a building information certificate (BIC) application or sharing the report with buyers.
Contact Our Friendly & Experienced Team
Get a BCA Report Before You Buy
✓ Free fee proposal ✓ Registered certifiers ✓ Class 1 & 10 residential
✓ Free fee proposal
✓ Registered certifiers
✓ Class 1 & 10 residential
NSW building law is changing. The Building (Approvals and Practitioners) Act 2026 passed in August 2026, but most of it isn’t in force yet. Once it starts, it adds a new way to authorise work that’s already been built, provided it meets the Building Code of Australia. Until then, the BIC remains the main option. We’ll update this guide when the changes take effect.
FAQs
Common Questions About Unapproved Renovations or Structures
Do I have to disclose unapproved structures when selling a house in NSW?
It depends on your contract and circumstances, so get advice from your conveyancer or solicitor before you list. Agents can’t mislead buyers, so how unapproved rooms or structures are described in the listing matters too. Buyers often find unapproved work through their conveyancer’s searches anyway, and work found late in a sale tends to cost the vendor more than work disclosed up front.
Can I sell a house with unapproved structures in NSW?
Yes. Unapproved work doesn’t stop a sale, but it usually affects the price, the contract or both. Some buyers will ask for a lower price, a longer settlement or a building information certificate (BIC) before settlement, and some will walk away. Knowing what you’re dealing with before you list gives you more control over how the work is handled.
Can I buy a house with unapproved renovations and deal with them after settlement?
Yes. Once contracts are exchanged you can apply for a building information certificate (BIC) as the buyer, and after settlement you can apply as the owner. Find out what’s involved before you commit, because council may ask for changes to the work. If it decides the work would never have been approved, it can refuse the BIC and order changes instead.
Should I get a BCA report before buying a house with unapproved renovations?
If you’re not sure whether the work can be brought into line, yes, and ideally before you exchange. A BCA report shows what was built, what complies and what needs fixing, so you can price the work into your offer or negotiate with the vendor. Ask the vendor first whether they already have a report or any engineering for the work.
What is a BCA report for unapproved work?
A BCA report assesses existing building work against the National Construction Code, including the Building Code of Australia. It identifies whether the work appears capable of achieving compliance and sets out anything that may need further investigation, rectification or extra documentation. The same report can support an application for a building information certificate (BIC).
What is a building information certificate (BIC), and does it approve the work?
A BIC is a certificate issued by council for building work that’s already been done. It doesn’t approve the work, because work can’t be approved retrospectively under the current rules. Instead, it stops council ordering the work covered by the certificate to be repaired, demolished, altered or rebuilt. It doesn’t stop council fining or prosecuting whoever built it without approval.
How long does a building information certificate (BIC) take in NSW?
It varies by council and depends on whether fixes are needed first. Council can ask for plans, a survey or certificates before it decides, which adds time. If council hasn’t made a decision after 40 days, the application counts as refused, and you can appeal. Allowing a few months before a sale campaign is sensible if you plan to apply.
How much does a BCA report for unapproved work cost?
It depends on what was built, how many structures are involved, what paperwork already exists and whether an engineer is needed. A single deck usually involves less work than a granny flat or garage conversion. Send us the details and photos of the work, and we’ll give you a free fee proposal.
Will unapproved renovations affect my home loan?
They can. Some lenders’ valuers leave unapproved rooms or structures out of the property’s value, which can reduce how much you can borrow. Lenders take different approaches, so tell your broker about any unapproved work early, before you exchange.
Can council make me remove unapproved work after I buy the house?
Yes. Council orders about unapproved work bind the next owner, so the risk passes to you at settlement. Before most orders, council must give notice and consider what you send in, and you can appeal an order to the Land and Environment Court within 28 days. A BCA report and a BIC application are usually the best response.
Is unapproved work the same as illegal building work?
People use the terms loosely. In practice, both mean work carried out without the approval it needed, such as a development application (DA), complying development certificate (CDC) or construction certificate. Unapproved work can often be resolved with a building information certificate (BIC), once any required fixes are done.
Book Your BCA Report Before You Buy or Sell in Sydney
A clear BCA report does more than put the compliance status of the work on paper. It shows what was built, what complies and what needs fixing before a buyer, lender or council asks. That gives you time to deal with it on your own terms, rather than late in a sale.
CertOne Building Certifiers prepares BCA reports for homeowners selling a house with unapproved structures and for buyers looking at a house with unapproved renovations across Greater Sydney. From the first look at the work to guidance on a building information certificate (BIC), we help you understand where you stand and what comes next.
With clear communication, practical advice and experienced private certifiers, we help you avoid surprises during the sale, price the work with confidence and move towards settlement without last-minute delays.
Call us today or request a free fee proposal to book a BCA report for unapproved work in Sydney.
Contact Our Friendly & Experienced Team
Get a Free Fee Proposal for Your BCA Report
✓ Free fee proposal ✓ Registered certifiers ✓ Class 1 & 10 residential
✓ Free fee proposal
✓ Registered certifiers
✓ Class 1 & 10 residential